PSD Full Blend

Started by karmann, August 20, 2009, 11:52:51 AM

Previous topic - Next topic

karmann

My charger is a PSD Full Blend but what exactly was done to this? i need to know to sort my paper work out for the car.
Cheers guys

PeteG40

it means it was ported by psd to their maximum limit. it was also probably serviced a the same time

karmann

yes i know, but wanted to know the spec of the mods done

PeteG40


karmann

Ok, jabbsport do a stage 4 consisting of

* Performance upgrade including service
* Completely dismantle, clean & inspect all components
* Casings Glass Bead blasted for a professional finish
* Port/Flow G-Lader Outlet
* Modify casing chambers to aid cooling to diffuser counter shaft bearing
* Port diffuser / scroll
* Replacement of bearings (steel cage)
* Replace oil seals with upgrade high pressure oil seals
* Re-new APEX seals
* Re-new outer shaft steel ring
* Upgrade to wide timing belt
* Balanced
* Application of special coating to enhance boost
* Re-assembly of G-Lader
* Pressure test
* Certificate of G-Lader rebuild with serial number

but what did the PSD Fullblend do that was different from the jabba? im just curious to know.


PeteG40

Performance upgrade including service 
* Completely dismantle, clean & inspect all components (that should be done in any charger service)
* Casings Glass Bead blasted for a professional finish (psd used to paint them)
* Port/Flow G-Lader Outlet (psd ported them extremely)
* Modify casing chambers to aid cooling to diffuser counter shaft bearing (psd would port here as well)
* Port diffuser / scroll (psd would port these extremely too)
* Replacement of bearings (steel cage)  (psd would replace these too - however quite a few charger service companies do not replace the outlet side bearing, as it is an ar5e to get out and they are about £35-40 a bearing)
* Replace oil seals with upgrade high pressure oil seals  (psd would replace seals - they need to be replaced if you are either porting, or replacing bearings)
* Re-new APEX seals (they'd do that)
* Re-new outer shaft steel ring (only jabba do this as they have them specially made - £20 on their site)
* Upgrade to wide timing belt (psd would do this)
* Balanced (not sure what this means - presumably, re apply the balance weight inside)
* Application of special coating to enhance boost (aka charger grease, again psd would've done)
* Re-assembly of G-Lader
* Pressure test
* Certificate of G-Lader rebuild with serial number - (psd might sign theirs inside)


basically above describes a strip down, service and port of a g-lader. the only 'mod' done is the porting.

polo classic

Quote from: karmann on August 20, 2009, 11:08:44 PM

but what did the PSD Fullblend do that was different from the jabba? im just curious to know.



More porting, but not porting the scroll.

Personally, i do not thouch the scroll either

PeteG40

psd do port scrolls, or have in every full blend i've had apart! jabba do too...

g-werks tend to leave them alone