Hello guys, I'm advancing very slowly but steady, it's hard to work on the car when you are 100km away at the university. I made the new engine mounts, modified the throttle cable to fit the stock pedal. I took of all the parts from the engine what I could, cleand and painted it. The flywheel was lightened, they removed around 0.77kg. I found some injectors from a Golf mk4, 1.8t, 258cc, I hope they will be ok, for the new soft, what I hopefully will order next month from PPP (I'm missing 10£ for the shipping). Tomorrow I will order a 7 row oil coller, I hope it will be enough, and a boost swich. I've got an intercoller what I hope i can mod to fit the small place under the front bumper. For now this is all, I hope in a few weeks I will be back with a painted enginebay and a semiassembled engine.