Not at the moment, for the last few months I've been putting a second floor up at the unit, about 60m of RSJ, and a hell of alot of grinding, welding, drilling and painting.
Lots of the G40 lads have seen it 'in progress' although everything takes so long I'm itching to get started on the car. My aim is to have it done apart from mapping by BVF, which I'm hoping it will be there on a trailer